From Alderman Pawar. Dear Neighbor,
As the year comes to a close, I would like to provide a summary of the 2018 Aldermanic Menu Program projects that were selected and authorized by my office. Each year, aldermen are provided $1.32 million to spend on infrastructure and other projects in their ward. Each year, we ask residents and businesses to complete block audits and vote on a list of possible projects before surveying, making selections, and receiving cost estimates from CDOT. The next alderman will be making the 2019 Menu selections, but I will provide them with the list of everything that has been proposed. Please note that many alley resurfacing projects around the city will be completed in Spring/Summer 2019 due to such a high volume of street resurfacing projects in 2018. Below is a summary of the projects authorized in 2018:
Alley Resurfacings (to be performed in Spring/Summer 2019):
• 1400 W Irving Park/Cuyler (north-south stretch)
• 2400 W Hutchinson/Cullom (north-south stretch)
• 3600 N Leavitt/Bell (east-west stretch)
• 3900 N Hamilton/Leavitt (east-west stretch)
• 4300 N Leavitt/Bell (east-west stretch: southern end)
Street Resurfacings:
• 1600-99 W Belle Plaine: Ashland to Paulina
• 1740-1899 W Cornelia: Lincoln to Wolcott
• 1746-99 W Belle Plaine: Hermitage to Ravenswood
• 3200-99 N Wolcott: Belmont to School (split w/32nd Ward)
• 4300-29 N Campbell: Cullom to Pensacola
• 4600-17 N Campbell: Wilson to Eastwood
• Grind and Patch Projects: various locations
Concrete Alley Aprons:
• 1751 W Wilson
• 1943 W Waveland
• 1951 W Leland
• 3510 N Wolcott
• 4015 N Campbell
Though, a buy cheap cialis short-term treatment option; it gives instant results for about 30 minutes to 1 hour. All these herbs are combined in right ratio and processed further in the decoction of Bala, Musli Sya, Ashwagandha and Bala to http://www.learningworksca.org/wp-content/uploads/2012/02/004-Testing-and-Beyond-Panelist-and-Facilitator-Bios.pdf bulk viagra make this pill a lot. You should have a strategy that incorporates lifestyle approaches such as laughing, exercising etc with online cialis these medications assist to keep up one’s sexual functions. As we grow old, it super active cialis starts diminishing, and we become vulnerable to infections and diseases.
Pedestrian Safety:
• 2330 W Irving Park: striping and concrete bump-out
• 2430 W Roscoe: new crosswalk south of Lane Tech between shopping centers
• 4700 N Lincoln: Lincoln/Leland Intersection Improvements
• Pedestrian Countdown Clock and Signal Improvement Projects (in progress):
• Clark/Montrose (split w/46th Ward)
• Damen/Wilson
• Montrose/Wolcott
• In Road Pedestrian Crossing Signs: various locations
Other Community Projects:
• 4100 N Damen: Northcenter Town Square
• 3500 N Hoyne: Audubon Outdoor Play Area
• 2231-2399 W Sunnyside: curb/gutter replacements along Welles Park
• 2741 W Montrose: Horner Park Dog Friendly Area (at Irving Park and California)
• 3730 N Oakley: Bell Elementary Public Art
• Sidewalk and Curb/Gutter Projects: various locations
• New Alley Lights: various locations
• Tree Plantings: various locations
• Speed Hump Installations and Removals: various locations